Preconstruction

Preconstruction_350x263.jpg Our mechanical preconstruction experts collaborate with owners and the design team to help develop the optimal HVAC and plumbing systems for each project. We provide professional design-assist solutions, including budgeting, constructability reviews, and pre-commissioning planning services.

We have the expertise needed to apply a range of specialized techniques and procedures that can help end-users, owners, general contractors, and architects achieve substantial benefits before construction begins. By getting our preconstruction experts involved early in the planning stage, clients can employ strategies that help complete projects on time and within budget, while achieving the quality and reliability necessary for consistent productivity and long-lasting value

Helping Ensure Cost Success

Our transparent conceptual budgeting process is central to our preconstruction approach, helping control costs and identify opportunities to add value. We rely on historical data, our vast experience, and current design information to arrive at the most accurate budget possible. Utilizing trend logging and design evolution technology to document quantifiable additions and deductions, we help the entire project team track budget progress in real-time as design collaboration progresses. The goal is to build trust, ownership, and accountability, all requirements for a successful project.

Features of Our Preconstruction Approach

  • Planning for Future Needs – We plan early for system commissioning, creating detailed diagrams and models for everything from piping and instrumentation to valves, vents, and drains. Additionally, the test and balance contractor is included in our shop drawing review to facilitate a smooth process.
  • System Design – During the layout phase, care is taken to eliminate all conflicts and constructability issues, optimize construction sequencing, and identify opportunities for early installation.
  • Commissioning – We utilize advanced web-based software to closely monitor commissioning progress, open items, and promote timely issue resolution.
  • Offsite Prefabrication – Whether for ductwork or rack piping systems, we seek out every opportunity to utilize fabrication as early in the construction process as possible. Prefabrication helps us increase productivity and quality, minimize material handling, and promote safety.