Arizona State University, PHOENIX, AZ
VALUE DELIVERED
A 178,000 s.f. mid-rise building used for high-tech studies and research needed to accommodate ASU’s growing enrollment, and vision of becoming a research powerhouse.
CLIENT OBJECTIVES
To build a state of the art facility that is equipped with the latest technology, that is easily adaptable to a multitude of uses, and researchers.
SCOPE OF SERVICES
UMEC provided Design/Assist services, as well as complete HVAC, sheet-metal, piping, plumbing.
SOLUTIONS
UMEC’s BIM Build capabilities helped to solve the coordination issues of a complex building structure prior to construction, making an aggressive schedule workable.
BACKGROUND
ASU ISTB1 is the first of five Interdisciplinary, Science, and Technology Buildings planned for ASU’s main campus. The building houses research labs, and workspace for bioengineering, neural engineering, molecular engineering, and cell and tissue engineering research.